Assignar

Industry Resources

The content highlights multiple industry case studies demonstrating how companies like Schwarz, Yambuk Labour & Traffic Solutions, MCC Contractors, Resolve Marine, Traffic Force, Workzone Traffic Control, and Subterra have leveraged digital solutions, particularly Assignar’s platform, to improve workforce management, operational efficiency, job costing accuracy, and scalability across diverse sectors such as construction, marine salvage, and traffic management.

Industry Case Studies and Success Stories

  • Schwarz improved job costing accuracy, eliminated manual admin, and reallocated $700K from overheads to jobs in just three months by integrating field operations, job costing, and financial systems.

  • Indigenous-owned Yambuk Labour & Traffic Solutions is transforming workforce management with Assignar, elevating operations and empowering First Nations people and those working in regional areas, creating meaningful employment opportunities. Learn how digital solutions improve efficiency, accountability, and career pathways.

  • As the civil construction company MCC Contractors expanded their services and tackled more areas, handling paperwork and timesheets for their fluctuating workforce became a time-consuming challenge.

  • Before adopting Assignar’s platform, Resolve Marine faced several challenges in managing its large workforce, which consisted of over 300 employees spread across various locations worldwide. As a marine salvaging company, their operations were diverse, ranging from emergency responses and maritime projects to reef restoration and oil pollution containment.

  • Traffic Force, a leading traffic management provider in Western Australia, experienced massive growth in just over a decade. With a total of 3 depots and a traffic management training business, Traffic Force sought a way to leave their server-based system behind for a digital solution that could communicate more efficiently with their traffic controllers.

  • Workzone Traffic Control, a traffic management solutions company from South Australia, started out 20 years ago in a front yard with 4 vehicles. Today, the company manages 36 vehicles and over 100 workers. With their number of jobs increasing, the company needed an alternative to the Outlook calendar they had been depending on so they could solve their operational bottlenecks.

  • Subterra has experienced significant growth over the years, extending its services to various multidisciplinary projects. As the business expanded, Subterra faced challenges in managing timesheets, tracking machine service and maintenance, and facilitating effective communication between the field and the office.

  • Before implementing Assignar, Formula Alberta faced significant challenges in maintaining safety and engineering documentation. They relied on hard copy books that contained the relevant documentation, which contributed to delays, mismanagement, and loss of documents. Formula Alberta had to maintain safety documentation records in case of an impromptu audit to meet safety audit requirements, which was a tedious process.

  • Assignar has been a fantastic solution for Martinus Rail, enabling engineers to track daily true costs up-to-the-minute, which was impossible with spreadsheets or paper dockets. Shelley and her team worked with supervisors on site to integrate Assignar into daily work, which helped to make their jobs easier, more efficient, and freed up staff for other tasks.

  • Before March 2022, J&S Drilling faced challenges in tracking their field staff. They relied on spreadsheets, PDFs, and writable forms for tracking their progress onsite. A mix of technological advancements and client expectations meant that ‘everybody wanted everything – almost live’. Waiting until the end of a project to get the paperwork and analyze the data was not cutting it.

  • As a mobile company, Deverni needed to find paperless solutions and overcome logistical restrictions caused by the pandemic. Additionally, the uncertainty around underground utilities made it crucial for Deverni to adopt a safe and efficient method of excavation.

  • With more work comes more information that needs capturing in the field. Don Mann previously relied on paper timesheets and forms to collect this data. Today, all employees at Don Mann fill out their time with Assignar, and they use custom forms to collect job costing, job numbers, and cost codes.

  • Lily Hedges runs operations for three family businesses based in Australia: Enteq, Site & See, and Hydro-Vac Operations. After using Assignar at their flagship dry hire business Enteq since 2016, Hedges and her team didn’t hesitate to implement it in the family’s two new ventures. Here’s how she uses Assignar to manage three businesses and the value it provides for these family-run companies.

  • For Penington Painting Company, documentation is critical. Since they couldn’t prove which coatings were applied correctly after the fact, they had to document everything as they worked—which led to mountains of paperwork for their team. That’s why Project Manager Taylor Bischoff was tasked with finding a streamlined, faster solution for the field.

  • Before Larcon implemented Assignar, General Manager Brian Winn and Business Manager Annice Stephens were the only administrators. Brian ran the service and construction departments alone. To get paperwork from the field, he had his foreman come into the office once a week to drop off paperwork. When paperwork didn’t turn up, Brian would drive to the job site, only to find that it never got filled out.

  • Ultra Engineering digs holes with air to avoid the risks associated with traditional excavation methods, such as hitting high-pressure gas lines or electrical cables.

  • With increasing infrastructure work and poised for growth, Vision Industrial adopted Assignar to take their business from analog to digital—gaining productivity and efficiency in the process.

  • "We have used Assignar in our bigger tenders and won them, and I do think that having Assignar has been an advantage."

  • "We have saved 1-2 weeks in the data collection and approval process of service dockets."

  • As a growing company, managing operations using traditional methods became increasingly time-consuming and prone to errors. The use of paper documentation, including timesheets, forms, and dockets, was causing unnecessary double handling and delays.

  • As a prominent provider of crane hire, specialized transport, and traffic control in Western Australia, Kwik Logistic achieved remarkable growth over the years, catering to diverse projects in mining, commercial, residential, civil, and renewable energy sectors. As the company expanded, the team recognized the need for modernizing its operational systems to support its growth.

  • Discover how OE Construction optimized its field operations and streamlined project management with Assignar’s platform. Assignar helped OE Construction enhance productivity, improve scheduling, and achieve better operational visibility.

Upcoming Webinar

What's actually working in construction finance right now

Join us on June 24 (NAM) / June 25 (AUS) as three construction finance leaders sit down for a candid 30-minute panel on margin, AI, and the year ahead. Real answers. No pitch. Worth your time.

Register Now →

Contact

AUS Sales: (07) 5230 8223
US & CAN Sales: (833) 584-2220

Book a demo